The installation process of pipe bending machine involves many techniques. Therefore, in pipeline installation engineering, a large number of bends with various angles are required, such as 90 ° and 45 ° bends, B-shaped bends (back and forth bends), holding bends (arc bends), square expansion joints, etc. Based on the construction site equipment conditions and the size of the bend pipe diameter, processing equipment and corresponding construction processes can be selected, which can be processed on site or finalized for production in the processing plant. Equipment required for pipeline installation: manual pipe bender, pulley pipe bender, electric or hydraulic pipe bender, fully automatic pipe bender, hair dryer, mold, steel ruler, oven, workbench, acetylene generator, welding and cutting tools, etc.
Bending conditions: Construction drawings and standard drawings have been prepared and reviewed. (There are construction sites and workbenches that meet safety requirements. All pipes with qualified certificates must be delivered to the site. Technical disclosure has been conducted, familiarize yourself with the specifications, dimensions, and angles of each processing part, and prepare material labels. When using a manual pipe bending machine for bending, the operator's face must avoid the bent steel pipe to prevent the pipe bending machine from slipping and injuring people.).
When using fire to simmer and bend, it is prohibited to stand at the pipe mouth to prevent personnel from being injured by blasting. The location of the coal furnace should be in contact with the fire department, and the flammable materials surrounding it must be eliminated. The fire must be extinguished before work to prevent accidents.
The acetylene generator must be equipped with a safety device to prevent backfire, and the safety chain, oxygen cylinder, oxygen meter, and welding and cutting tools must not be contaminated with grease. The oxygen cylinder should have shockproof rubber rings.